Port Talbot Automatic Barriers

Sector: Manufacturing – Port Talbot Automatic Barriers
Security Level: Traffic Control
Requirement: Numerous Automatic Barriers
Equipment Installed: 20no FB Automatic Barriers
Services: Consultancy, Design, Manufacture, Installation, Commissioning, Maintenance
Completion Date: 2013
Port Talbot Automatic Barriers
Port Talbot Steelworks is a steel mill in Port Talbot, Wales. It is the largest steelworks in the United Kingdom and one of the largest in the world. Over 4,000 people worked at the plant until the last blast furnace closed in October 2024. Around 2,000 employees remain after this time, processing imported steel slabs to produce rolled steel products.The mill is in the process of building a 320-ton capacity electric arc furnace which would be operational in late 2027.
Frontier Pitts Automatic Barriers model FB provide traffic control to various vehicles including trains and trams at the Port Talbot Steel Works
Port Talbot Steelworks is an integrated steel production plant in West Glamorgan, Wales, capable of producing nearly 5 million tonnes of steel slab per annum, making it the largest of all three major steel plants in the UK and one of the largest in Europe.
With boom lengths of up to 9 metres, Frontier Pitts FB model of Automatic Barrier was the perfect solution. The torque motor barriers have 100% duty rating, instantly reversible and constantly energised, which provides security locking and protection against low temperatures and damp conditions. Lower folding skirts are also available on boom lengths up to 7.5m.Together with the installation of Wig Wag lights, the automatic barrier system is the perfect solution for traffic control throughout the busy steelwork site.